When arranging small drying holes and tunnel kilns in the area shown in the diagram, Two are planned and one will be built first. Is the space sufficient? Client can purchase the material storage are
Date:2024-03-18
When arranging small drying holes and tunnel kilns in the area shown in the diagram, Two are planned and one will be built first. Is the space sufficient? Client can purchase the material storage area and green area.
Generally, the length and width of the kiln are determined first based on the output, the length of the 3.6m tunnel kiln is 134.2m. Next is the number of small drying holes, the length of the small drying hole is 65-74m, and the storage capacity at both ends is considered by 20m. Finally, the process equipment is selected and arranged based on client’s requirement. We will try to organize the layout as neatly as possible.