2025 Brictec Malaysia CBT Project Construction Status Record
Date:2025-03-14
2025 Brictec Malaysia CBT Project Construction Status Record
As of March 12, 2025, the construction site status of the production line of Brictec Malaysia CBT clay decorative brick project,
Malaysia CBT decorative bricks production line project is Brictec's flagship model project in Southeast Asia, designed to produce a daily output of 70,000 decorative bricks (215x100x67mm). Due to the molding shift of 6 days per week, the actual daily output is about 85,000 pieces.
The main project process for decorative bricks production line:
The project adopts wet plastic extrusion process, its drying adopts single layer tunnel dryer with support bar recycling, and firing uses external firing tunnel kiln with flat ceiling of lightweight mullite. The operating equipment can be automatically controlled, and the drying chamber and tunnel kiln are centrally controlled.
Construction site progress of Brictec Malaysia CBT project in March 2025
Installation and commissioning of Brictec clay brick production line cutting,stacking and conveying automation equipment
Electrical engineers from Brictec Engineering are commissioning and installing automatic loading and unloading equipment for clay brick production line.
Brictec Engineering drying chamber top
Brictec Engineering installing and commissioning of super fine roller mill, front stencil mixing extruder, crusher and other equipment for clay brick raw material processing.
Brictec Engineering Installing the front stencil mixing extruder and conveyor belt
Brictec Engineering Installation and commissioning of tunnel kiln natural gas burner (dual-purpose oil and gas tunnel kiln burner).