Answer (Brandon, Amanda): Generally, the factory construction cycle is 6 months, and two technicians are enough
According to the data, the coal injection holes range from 52 to 72, and the position on the kiln is in the roasting zone How to determine the position? Coal throwing holes are generally distributed in three rows How to determine the number of columns? Ask Engineering Yang for a
Check the information: The medium transported by the centrifugal fan is air and other unnatural, harmless, and non-corrosive gases to steel materials, and the maximum temperature must not be exceeded 80℃; the medium transported by the centrifugal induced draft fan is flue gas, and the
(The floor plan can be made by Party A or Party B)Answer (Engineering Yang): Equipment installation drawings and floor plan are required If you have a process plan, you don& 39;t need a factory drawing If you don& 39;t have one, you need a factory drawing He has already laid out the certain things , and we will decide the other things
Domestic business: 156-1925-3978 International business: 008618182622677 Technical consultation: 029-89183545
Email: info@brictec.com website: www. brictec.com
Address: Room B501, R&D Building, Zhongxing Industrial Park, No. 10 Tangyan South Road, High-tech Zone, Xi'an City, Shaanxi Province
Xi 'an Brictec Engineering Co., Ltd. Copyright@2011-2019