Development History - Xi'an Brictec engineering Co., Ltd.

2023

Iraq Najmadin project in 2023
This project was jointly designed and implemented by Brictec and China National Building Materials Co., Ltd. in 2023, with a daily output of 750 tons of sintered bricks. It is located in Sulaimani Province, Kurdish region of Iraq, and the raw material is shale. Brictec has participated in project planning, design, construction and commissioning. Single layer tunnel dryer process is adopted, and Heavy oil/liquefied petroleum gas dual fuel serve as the fuel for dryer and tunnel kiln (9 meters cross-section) . In this project, Brictec competes with European production line on the same platform and wins honor for the country. So far the project has been put into production, expecting to meet the production target in May 2024.


2023

Zhejiang Lvzhan Project in 2023

The project has annual output of 300,000㎡ of sintered bricks and prefabricated brick wall by using local solid waste such as chemical contaminated soil, construction residue, printing and dyeing sludge as the main raw materials, etc. so as to make high quality sintered bricks making, and 60%-70% of electricity needed for production line is from the photovoltaic power generation on the factory roof. Brictec provides whole package service from the preliminary planning and design of the project to the supply of core equipment in the later stage. Single layer tunnel dryer process is adopted with natural gas burning system for tunnel kiln (7 meters inner width).




2022

Antique Bricks Project for Yan'an Green Building Material Recycling Industrial Zone in April, 2022

Antique Bricks Project for Yan'an Green Building Material Recycling Industrial Zone in April, 2022
The project mainly produces antique bricks, facing bricks and paver and others. The raw material is high-quality shale and purple sand soil, and the fuel is natural gas. The entire production line combines two shaping methods (extruding and pressing), and uses chamber dryer for drying and tunnel kiln for burning, and integrates three shuttle kilns for antique bricks production.Brictec was fully engaged and offer excellent package service in the project in the preliminary process design, dryer construction and core equipment supply and production commissioning. This automatic degree applied in this project is the highest domestically, also meets the advanced international level.


2021

Kazakhstan WG project in 2021

Brictec provides the whole set of cutting, loading & unloading automation equipment and natural gas burning system for this project. The pressing shaping process is adopted with natural gas as fuel.Under the background of COVID-19 pandemic, Brictec was still dedicated to serve its valuable clients for project installation and commissioning services. Clients compliments Brictec as the most reliable partner, offering easier natural gas burning system with lower energy consumption than European system. The system and its technology is mature with much more competitive performance to European counterparts.


2020

Tajikistan BAHA project in 2020

From April to May, 2020, over 50 containers were transferred from Xi’an Port to Tajikistan through CR Express. This BAHA project is kind of contribution made by Brictec for Belt and Road Initiative for high quality development together.

2019

Bangladesh Projects in 2019

ECO CERAMICS project adopted the single layer tunnel dryer process, Italian brand roller mill and extruder (BONGIANNI), as well as pulverized coal burning system independent developed by Brictec, and has already been put into production. The project was invested by GPH group, the largest building material manufacturer in Bangladesh who owns top three cement plant and largest steel plant. Another new project under construction is regarded as the one with largest capacity and with highest automation degree in Bangladesh.
Pretty project, USHA project and ALPHA project were all completed successively by Brictec in 2019.
Both Brictec and Shandong Mine Machinery Cosmec had great development this year and doubled their performance.


2018

Development in 2018

In February, the new prefabricated tunnel kiln developed by Brictec gained the national invention patent;
In April, Brictec contracted to operate Shandong Mine Machinery Cosmec Materials Machinery Co., Ltd., and doubled its performance that year.
In July, Brictec attended Ceramitec exhibition in Munich, Germany, one representative from brick making industry to attend the highest level of international exhibitions.
In October, the first upgraded tunnel kiln by using Brictec’s natural gas burner system technology was put into operation successfully.

2017

Turnkey project in Bangladesh in 2017

Turnkey project in Bangladesh in 2017,SAS project in Bangladesh, a turnkey project with two time setting process applied, was put into operation successfully. The two tunnel kilns of the project adopted BERNINI pulverized coal burners for external burning, with the investment over 10 million US dollars. The successful delivery of
the project represents Brictec’s high-end brick production technology has reached international level.


2016

Patent and technology introducing in 2016

Brictec developed a new process to produce sintered bricks with ultra-high fly ash content, and obtained national invention patent because of this. In the same year, the company cooperated with FRAC from Italy and introduced its natural gas burner system.

2014-2015

Rapid development in Bangladesh in 2014
Accomplishements in 2015

Brictec completed COMPREHENSIVE project, G.S.A project, Chattogram S.B project in Bangladesh successively, accumulated rich experience in projects, and achieved perfect labor division and cooperation between domestic technical team and local team.
Brictec completed three projects in Bangladesh, and another two projects in India with the help of Bangladeshi construction team.



2013

Establishment of local branch office in Bangladesh in 2013

Brictec set up a joint venture branch with local employees in Bangladesh, paving a successful path in building local team and providing localized service. Its business in Bangladesh has entered into a period of rapid development, which has laid a solid foundation for the successful delivery of over 20 projects in the next few years.


2012

Bangladesh Conforce project in 2012

Brictec undertook the first tunnel kiln project (Conforce project) in Bangladesh to build a flat-top tunnel kiln with 2.5 meter wide cross-section. This kiln is known as the earliest tunnel kiln in Bangladesh and is still in production today.


2011

Company Incorporation in 2011

Xi’an Brictec Engineering Co., Ltd. was founded in 2011. Driven by the idea of providing one-stop solutions for brick factories to help them produce high quality bricks, the company relies on its profound brick making technology heritage and excellent experts of the field, and also hires Italian senior engineers to create a strong technical team with a combination of European and Chinese technologies, in order to provide clients with professional technical solutions for bricks including building materials bricks, decorative bricks, press bricks and others.


International Business:+86 181-8262-2677   
Domestic Business:+86 156-1925-3978

Email address:info@brictec.com      Website:www. brictec.com

Address:Room B501, R&D Building, ZTE Industrial Park, No. 10 Tangyan South Road, High-tech Zone, Xi'an City, Shaanxi Province, China. Click on Map

Brictec Technology Copyright@2011-2019 Shaanxi ICP Record No. 19011661

Search

Your Keywords

陕公网安备 61019002002413号