Bangladesh SAS project production situation
Date:2019-04-24
Bangladesh SAS project production situation
Recently, International business department and Engineering Services Department of Xi’an Brictec organized project personnel to come to the SAS Ceramics project site in Bangladesh for return visit and after-sales service.
The Bangladesh SAS project was started in 2017 and completed construction and production in early 2018. It is the first fully automatic two times setting production line in Bangladesh. The project adopts tunnel single-layer drying with the drying process of automatic loading and unloading system, and the tunnel kiln is equipped with the automatic pulverized coal burner firing process. The whole project has a high level of automation and applies advanced technology, which solves the problems of high moisture content of soil and other drying difficulties, and meets the production requirements for different types of high-grade bricks.
After several months of trial production, the production line is stable, reliable and easy to use, and is highly praised by clients and peers. The fully automatic production process makes the brick products uniform in size and in color, and the overall appearance and strength are superior. Even the ordinary solid brick products could meet the requirements of decorative bricks, and the price of the products is higher than the market average.