October Brictec–MUSK Project Site Construction Update - Company News - Xi'an Brictec engineering Co., Ltd.

October Brictec–MUSK Project Site Construction Update

Date:2026-10-08

October Brictec–MUSK Project Site Construction Update

I. Project Overview:
The MUSK project is located in Kirkuk, Iraq, and is planned as a modern block production base with a daily output of 800 tons. Its product range covers load-bearing blocks, standard bricks, and partition blocks, meeting the material requirements of various local building structures and providing a stable, high-quality supply for regional urban construction.

II. Construction Update:
Construction activities at the MUSK project site are proceeding efficiently and in an orderly manner. At the current stage, the focus is on the drying chamber, tunnel kiln masonry, and partial construction of the aging warehouse.
Brictec has established a comprehensive on-site construction management system and engineering quality acceptance standards. Throughout construction, all process and inspection standards are strictly implemented. For example, critical procedures such as verticality inspection of formwork for drying chamber frame columns and elevation re-measurement of kiln walls are carried out under standardized process control to ensure construction quality.

III. Site Photos:
Concrete curing of the material storage warehouse retaining wall foundation

01.jpg

Drying Chamber Construction Update:
• Steel bar tying for the second span roof slab of the drying chamber

02.jpg03.jpg04.jpg

• Pipe fabrication on the drying chamber roof

05.jpg06.jpg07.jpg

• Construction of structural columns for the drying chamber

08.jpg

• Verticality inspection of formwork for the drying chamber's frame columns

09.jpg

Tunnel Kiln Construction Update:
• Storage of insulation cotton for the tunnel kiln

10.jpg

• Elevation measurement of tunnel kiln walls

11.jpg12.jpg

• Red brick masonry below the curved sealing bricks of the tunnel kiln

13.jpg14.jpg

Project Name: Brictec–MUSK
Information Source: Brictec Engineering Department
Edited and Published by: Brictec Marketing Department
Release Date: October 8, 2026

Previous:No information available

Next:Xi'an Brictec KTB Fired Brick Production Line Project Tunnel Kiln Waste Heat Pipeline Installation Progressing Steadily

News Recommendation

  • 1
  • 2
  • 3

International Business:+86 181-8262-2677   
Domestic Business:+86 156-1925-3978

Email address:info@brictec.com      Website:www. brictec.com

Address:Room B501, R&D Building, ZTE Industrial Park, No. 10 Tangyan South Road, High-tech Zone, Xi'an City, Shaanxi Province, China. Click on Map

Brictec Technology Copyright@2011-2019 Shaanxi ICP Record No. 19011661

Search

Your Keywords

陕公网安备 61019002002413号